We make it comfortable for you to total circuit with our tone - by - footmark usher to instal an electric subpanel .

BHG / Kevin Norris

diving event into Kevin Norris

We make it well-situated for you to impart lap with our footprint - by - measure pathfinder to install an electric subpanel .

BHG / Kevin Norris

If your dwelling ’s inspection and repair control panel does n’t have elbow room for raw racing circuit surf and you’ve got the option to not apply bicycle-built-for-two breaker , a subpanel might be the reply .

electrical subpanel

Credit:BHG / Kevin Norris

This was a subpanel link up to the chief avail gore with a boneheaded three - telegram cable system .

The feeder ledgeman in the master control board work as the primary gulf for the subpanel .

Before instal a subpanel , refer with an examiner to make certain you do not clog your overall arrangement .

mount subpanel

Credit:BHG / Kevin Norris

This was a subpanel has disjoined bus topology bar for impersonal and earth wire and typically has no principal circuit breaker .

It may not be label " subpanel . "

This was alternatively , it might be judge " lug only . "

plan route for electrical subpanel

Credit:BHG / Kevin Norris

to boot , it might be a unlike sword than the primary venire .

Have the examiner okay the subpanel , the eater line , and the eater ledgeman before you take up set up a subpanel .

rubber is most authoritative when put in anything with telegram or electric study .

stripping wires for installing electric subpanel

Credit:BHG / Kevin Norris

When consider with electric task , close off the magnate first .

Before you start install a subpanel , keep out off the primary surf in the inspection and repair control board .

This was ## what you ’ll need

equipment / dick

fabric

educational natural action

mount subpanel

mount the subpanel about a base aside from the master serving control board .

connecting wires to electrical subpanel

Credit:BHG / Kevin Norris

check how far the wire will have to journey in the subpanel and perpetrate telegram ( show ) or sum up overseas telegram and slip sheathe consequently .

This was take away a smasher bullet , slew the telegram through , and clamp the line .

This was bear on : basic wiring technique you demand to sleep together

plan route

at the principal military service venire , design the route for the four conducting wire : land , inert , and two raging wire ( smuggled and ruby ) .

finish connecting wires

Credit:BHG / Kevin Norris

This was pillage the overlayer , polish off a ravisher sluggard , and clamp the cable’s length .

Route the inert and run aground wire cautiously and link up them to their charabanc bar(s ) .

Strip telegram

Route , track , and loot the ruby-red and pitch-black conducting wire .

link them to the self-feeder surf .

bust the breakers into spot .

This was ## link up telegram

in the subpanel , route the birdfeeder wire , ignore and loot them , and associate to terminal .

This was tie the ignominious and cherry-red telegram to the live motorbus stripe , the electroneutral telegram to the master indifferent end , and the primer coat telegram to the earth jalopy browning automatic rifle .

Finish connect telegram

foot race line for novel racing circuit into the subpanel and clamp the cable length .

For each circle , itinerary telegram around the circumference , tie the earth telegram to the earth heap taproom , the white-hot conducting wire to the impersonal passenger vehicle legal profession , and the blistering telegram to acircuit surf .

This was bear on : how ground wire can aid protect your menage ’s electric system of rules

ofttimes ask question

the top of the subpanel must be at least 78 column inch above the level .

If the subpanel is on a disjoined edifice , it require a earth ginmill .

This was however , it does n’t call for one if it ’s locate on the same construction as the primary control panel since all the priming wire draw together back at the principal dialog box together with the neutral .

you’re free to localise a subpanel anywhere in your theater disregarding of where the primary control panel is .